How Much Deposit Should You Pay a Builder? What Protects You
By GuildSelect editorial.
A builder has agreed the job and asked for money before they start. This guide sets out what UK sources say is normal, what a deposit should and should not buy, and what protects you if the work does not go to plan.
How much deposit should you pay a builder?
Small, and tied to something specific. The Federation of Master Builders (FMB) says a small deposit is common on larger projects, mainly where materials or made-to-order items must be bought in advance, with around 10% often used as a guide. Citizens Advice says to avoid deposits where you can, push one down where you cannot, and not agree to more than 25%. A deposit of half the price before any work starts is where the risk sits.
The sources differ. Which? Trusted Traders (updated May 2026) accepts that a large deposit, "up to 50%", can happen on a big job, and says to ask whether it is insured if the trader goes out of business. Protection is the common thread.
So what about a builder asking for 50% upfront? "50% deposit" simply means half the job price paid before work starts, usually explained as materials. It can be reasonable when expensive bespoke items are ordered specially for your house. Which? says deposits should be needed only when the trader must buy goods or work to a bespoke design. It is hard to justify on a generic job with a vague quote.
What is the maximum deposit a builder can ask for?
We found no legal maximum for a domestic job. Neither GOV.UK nor Citizens Advice names a statutory cap, and trade guides say none exists (BookaBuilderUK, published September 2026; Renopay, updated November 2026; the Guild of Master Craftsmen, August 2026). What exists instead is guidance: FMB's guide of around 10%, and Citizens Advice's ceiling of 25%.
So ask what the money is for, and tie it to something you can see.
What a deposit should buy, and what it should never buy
A deposit is a commitment to start and a way to cover materials the trader must buy first. FMB says to ask what the deposit covers, make sure it is in your contract, and get a receipt for any payment. Citizens Advice has an alternative when the deposit is "for materials": offer to buy them yourself, so that if something goes wrong you at least own them.
A deposit should not be pre-payment for labour not yet done. These are the signs worth stopping for:
- Cash only. Citizens Advice says to avoid traders who only accept cash or want everything upfront.
- A large upfront sum with no explanation. FMB lists "an unusually large payment upfront without a clear explanation" as a warning sign.
- No written quote. Citizens Advice says to be wary of a trader who will not put anything in writing, or who gives only a mobile number.
- Pressure to decide immediately, another item on FMB's list.
- Cash requested "to avoid VAT", also on FMB's list.
More signs are in our builder red flags guide.
Stage payments: the safer default
Citizens Advice says paying in stages is a good idea because problems can be put right before the final payment, and that the points when payments fall due should be clear. FMB says larger projects usually split payments into agreed stages, and to check the stage is complete before you pay and keep a record.
A schedule might run deposit, first fix, second fix and completion. That is an illustration, not a standard, and the right stages depend on the job. The Guild of Master Craftsmen (November 2026) says stages should follow real, visible progress rather than dates alone. On bigger jobs a small slice is sometimes held back as "retention" until snagging is done. FMB says that is often around 2.5% to 5%, with the amount and release point written into the contract, and the Guild of Master Craftsmen says not every domestic job needs one.
The written quote that protects a deposit
Citizens Advice says a quote becomes a binding agreement once you accept it, written or not, but having it in writing lets you check what you agreed and prove it if there is a dispute.
What should be included in a contract with a builder?
Contracts do not need legal language, Citizens Advice says. They need to cover what you are paying for and everything you have agreed. Pulling together Citizens Advice and FMB, check for:
- The trader's full name, address and contact details, not just a mobile number.
- The scope of work, itemised, with anything excluded stated.
- Start and finish dates or a duration, and what happens if work is delayed.
- A fixed total price, whether VAT is included, how long the price holds, and when it can go up.
- The payment schedule, tied to stages, with the deposit amount and what it covers.
- Materials, subcontractors, tidying up and skips.
- How changes are priced and agreed in writing before the work happens.
- Insurance, warranties and how defects will be handled.
On changes, the rule we use across our guides is simple: anything outside the written scope is re-quoted before it happens, not after. To compare scopes, see how many quotes to get and the questions to ask a builder. For how the total itself is priced, see our builder cost guide.
How the payment method protects you
The method matters as much as the amount. Citizens Advice puts the order as card first, bank transfer if you cannot use a card, and no cash.
| Payment method | What it may give you | Source |
|---|---|---|
| Credit card | Section 75 for an item over £100 and up to £30,000; a card-paid deposit can bring the whole job within it. Chargeback otherwise | Citizens Advice, MoneyHelper (archived Mar 2026) |
| Debit card | Chargeback, any amount. A card-scheme rule, not a legal right; usually claim within about 120 days | Citizens Advice; MoneySavingExpert (updated Jul 2026) |
| Bank transfer | No chargeback or Section 75. Scam-refund rules exist for fraud (from 7 Oct 2024); ask your bank whether a failed job qualifies | Citizens Advice |
| Cash | No chargeback or Section 75, and not traceable | Citizens Advice, FMB |
| Milestone service (for example TrustMark Trusted Payments) | Money released as you sign off each stage; an insurance-backed warranty; fees apply | TrustMark (Oct 2026), CTSI |
These are summaries of published advice, not legal advice. Citizens Advice explains Section 75 and chargeback in full.
On cash, none of the guidance we read calls paying cash illegal. The point is that it leaves no record and no cover. Which? Trusted Traders treats it as one way traders ask to be paid and suggests counting it together.
For a larger deposit, ask what protects it. Citizens Advice suggests checking whether the trader has insurance covering the deposit, or whether it will go into an escrow account run by a firm on the Financial Conduct Authority register. It also says insurance-backed guarantees sometimes come with the work, such as new windows and doors. TrustMark expects registered businesses to have financial protection covering prepayments such as deposits, but tells you to ask the business and its provider exactly what cover applies to your job. FMB says its own warranty needs confirmation of a deposit within 28 days. Ask for the policy documents and check any membership claim on the scheme's own website, as Citizens Advice suggests.
If it goes wrong: what to do first
Take it in order. This is the sequence the published advice points to, not legal advice.
- Hold further payments. Citizens Advice says that if a deposit looks like more than the work done, you can suggest a figure and ask the trader to refund the difference.
- Gather the paperwork. Quote, contract, receipts, messages and photos, with notes of dates, as Citizens Advice suggests.
- Write to the trader. Email, keep copies, say what is wrong and what you want. Citizens Advice says to contact the trader first.
- Contact your card provider promptly if you paid by card. MoneySavingExpert says chargeback claims usually have to be in within about 120 days. If a claim fails, Citizens Advice points to the Financial Ombudsman Service.
- Call the Citizens Advice consumer service (0808 223 1133). Its advisers can pass information about your complaint to Trading Standards. The GOV.UK consumer rights page gives the same route.
- Treat a court claim as the last resort. GOV.UK has a guide to making a court claim for money. It points to Advicenow and Citizens Advice for help with a claim.
The check that beats any deposit rule
Every rule above makes a deposit safer. None replaces knowing who you are paying. A trader with years of public, unfiltered Google reviews, at volume, has a reputation to lose, and that is a practical protection no contract clause matches. It is the idea behind the Guild Standard: at least 4.6 stars on Google, 30 verified reviews and three years of trading.
Next step
Check a builder's public review record, then ask for the quote in writing. See also how to check a tradesperson is qualified, our builder red flags and all guides.